Please use this identifier to cite or link to this item: https://idr.l4.nitk.ac.in/jspui/handle/123456789/13830
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAgrawal A.
dc.contributor.authorDas B.B.
dc.contributor.authorMalik S.K.
dc.date.accessioned2020-03-31T14:15:25Z-
dc.date.available2020-03-31T14:15:25Z-
dc.date.issued2019
dc.identifier.citationLecture Notes in Civil Engineering, 2019, Vol.25, pp.167-176en_US
dc.identifier.uri10.1007/978-981-13-3317-0_15
dc.identifier.urihttp://idr.nitk.ac.in/jspui/handle/123456789/13830-
dc.description.abstractTime and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. The fundamental beginning is to support the same production for the different equipment to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. This paper aims to minimize the project total time and cost by means of the assignment of equipment of work to the different production lines of the activities. Construction project refers to a high-stake endeavor aiming at time-bound predetermined performance objective. Matching resources are planned and procured so that all activities can be executed according to a prefixed time schedule. Result shows that the optimization of resources is highly dependent on proper planning mechanism and efficient monitoring of its execution. © Springer Nature Singapore Pte Ltd. 2019.en_US
dc.titleOptimization of resources by real-time correlation study for maximizing the productivityen_US
dc.typeBook Chapteren_US
Appears in Collections:3. Book Chapters

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.